Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 14 m = 45.9 ft
Main Spans: 1 at 13.7 m = 44.9 ft
Approach Spans: 0
Skew: 19
Width, Roadway: 10.7 m = 35.1 ft (2 Lanes) and Out-To-Out: 11.6 m = 38.1 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pike [57826]: Wyoming County [121], New York [36]
Owned by State Highway Agency [01], DOT District: 46
1.6 MI SW JCT SH19 & SH39
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 63.5 metric ton = 69.9 tons (Load Factor(LF) [1])
Inventory: 38.1 metric ton = 41.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 1.9 km = 1.2 mi
Traffic
ADT: 1118 (2016) and Trucks: 12%
Future ADT: 1166 (In 2039
)