Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 14.6 m = 47.9 ft
Main Spans: 1 at 13.3 m = 43.6 ft
Approach Spans: 0
Skew: 12
Width, Roadway: 7.5 m = 24.6 ft (2 Lanes) and Out-To-Out: 9.8 m = 32.2 ft for a 7.5 m = 24.6 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Templeton [69275]: Worcester County [027], Massachusetts [25]
Owned by State Highway Agency [01], DOT District: 2
300' E JCT US 202
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 85.1 metric ton = 93.6 tons (Load Factor(LF) [1])
Inventory: 51 metric ton = 56.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 4784 (2018) and Trucks: 1%
Future ADT: 3159 (In 2031
)