Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 50.3 m = 165.0 ft
Main Spans: 3 at 22.8 m = 74.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 17.1 m = 56.1 ft (4 Lanes) and Out-To-Out: 20.1 m = 65.9 ft for a 19.5 m = 64.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Albany [01000]: Albany County [001], New York [36]
Owned by State Highway Agency [01], DOT District: 11
0.1 MI S JCT RT 9W & I787
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 82.6 metric ton = 90.9 tons (Load Factor(LF) [1])
Inventory: 49.9 metric ton = 54.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 20310 (2017) and Trucks: 3%
Future ADT: 20405 (In 2039
)