Bridge Type
Main Span(s): Concrete [1] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 12.2 m = 40.0 ft
Main Spans: 1 at 11.6 m = 38.1 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 14.6 m = 47.9 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Delavan [19450]: Walworth County [127], Wisconsin [55]
Owned by City or Municipal Highway Agency [04], DOT District: 2
4.8M E JCT STH 89
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 58.8 metric ton = 64.7 tons (Load Factor(LF) [1])
Inventory: 35.6 metric ton = 39.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 2020 [0820] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 9900 (2018) and Trucks: 3%
Future ADT: 11880 (In 2038
)