Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 21.3 m = 69.9 ft
Main Spans: 1 at 19.8 m = 65.0 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 11.8 m = 38.7 ft (2 Lanes) and Out-To-Out: 13.5 m = 44.3 ft for a 11.3 m = 37.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Sherburne [66894]: Chenango County [017], New York [36]
Owned by State Highway Agency [01], DOT District: 92
3.0 MI NW JCT RT 12B + 12
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 65.3 metric ton = 71.8 tons (Load Factor(LF) [1])
Inventory: 39 metric ton = 42.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 4418 (2014) and Trucks: 6%
Future ADT: 4445 (In 2039
)