HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


ON-RAMP OF I890 over VACANT LAND (Route: 0)
Num:00000000104992Ax
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 149.7 m = 491.2 ft
Main Spans: 8 at 24.7 m = 81.0 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 8.3 m = 27.2 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Schenectady [65508]: Schenectady County [093], New York [36]
Owned by State Highway Agency [01], DOT District: 16
1.6 MI NW JCT SH146& I890
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 55.3 metric ton = 60.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 2680 (2018) and Trucks: 9%
Future ADT: 4246 (In 2039 )
OFF-RAMP OF I890 over NORFOLK SOUTHERN (Route: 0)
Num:00000000104992Bx
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 168.2 m = 551.9 ft
Main Spans: 8 at 25.9 m = 85.0 ft
Approach Spans: 0
Skew: 19
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 8.3 m = 27.2 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Schenectady [65508]: Schenectady County [093], New York [36]
Owned by State Highway Agency [01], DOT District: 16
1.6 MI NW JCT SH146& I890
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: M 18 / H 20 [4]
Operating: 65.3 metric ton = 71.8 tons (Load Factor(LF) [1])
Inventory: 39 metric ton = 42.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 2925 (2018) and Trucks: 9%
Future ADT: 4635 (In 2039 )
RTE I890 over BIG CIRCLE: WASHINGTON A (Route: 890)
Num:1049910x
Open: no restriction [A]
Built: 1965, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 54.3 m = 178.2 ft
Main Spans: 3 at 21.3 m = 69.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.2 m = 40.0 ft (3 Lanes) and Out-To-Out: 13.8 m = 45.3 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Schenectady [65508]: Schenectady County [093], New York [36]
Owned by State Highway Agency [01], DOT District: 16
1.4 MI S JCT SH 5 & SH 50
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 75.2 metric ton = 82.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 58 metric ton = 63.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.4 km = 0.2 mi
Traffic
ADT: 12616 (2017) and Trucks: 9%
Future ADT: 19992 (In 2039 )
RTE I890 over Washington Ave Ramp: Amt (Route: 890)
Num:1049922x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 801.6 m = 2630.0 ft
Main Spans: 30 at 42.6 m = 139.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.9 m = 39.0 ft (3 Lanes) and Out-To-Out: 16.7 m = 54.8 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Schenectady [65508]: Schenectady County [093], New York [36]
Owned by State Highway Agency [01], DOT District: 16
1.6MI NW JCT. 146 & 890I
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Poor [4]
Loading
Design: MS 18 / HS 20 [5]
Operating: 45.4 metric ton = 49.9 tons (Load Factor(LF) [1])
Inventory: 27.2 metric ton = 29.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 23418 (2004) and Trucks: 9%
Future ADT: 32785 (In 2024 )
RTE I890 over Washington Ave Ramp: AMT (Route: 890)
Num:1049921x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 801.6 m = 2630.0 ft
Main Spans: 29 at 48.1 m = 157.8 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 11.9 m = 39.0 ft (3 Lanes) and Out-To-Out: 16.2 m = 53.2 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Schenectady [65508]: Schenectady County [093], New York [36]
Owned by State Highway Agency [01], DOT District: 16
1.6 MI NW JCT SH146 &I890
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59.9 metric ton = 65.9 tons (Load Factor(LF) [1])
Inventory: 35.4 metric ton = 38.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 9379 (2019) and Trucks: 9%
Future ADT: 14862 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider