HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 5


NH119 over CONNECTICUT RIVER (Route: 119)
Num:101302B06113021x
Open: no restriction [A]
Built: 1920, Reconstructed: 1988
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface:
Bridge Dimensions
Length: 103.3 m = 338.9 ft
Main Spans: 1 at 9.8 m = 32.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.2 m = 20.3 ft (2 Lanes) and Out-To-Out: 7 m = 23.0 ft for a 10.1 m = 33.1 ft approaching roadway.
Vertical Clearance: 3.51 m = 11.5 ft and Navigational Clearance: 0 = N/A
Location
Brattleboro [07900]: Windham County [025], Vermont [50]
Owned by State Highway Agency [01], DOT District: 2
AT VERMONT STATE LINE
Condition
Deck: Good [7]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 40.5 metric ton = 44.6 tons (Load Factor(LF) [1])
Inventory: 24.3 metric ton = 26.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 8
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 8492 (2017) and Trucks: 4%
Future ADT: 8917 (In 2027 )
NH119 over CONNECTICUT RIVER (Route: 119)
Num:12500410004000x
Open: no restriction [A]
Built: 1920, Reconstructed: 1988
Historic: Bridge is eligible for the NRHP. [2]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface:
Bridge Dimensions
Length: 103.3 m = 338.9 ft
Main Spans: 1 at 98.8 m = 324.2 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6.2 m = 20.3 ft (2 Lanes) and Out-To-Out: 7 m = 23.0 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 3.52 m = 11.5 ft and Navigational Clearance: 0 = N/A
Location
Hinsdale [36660]: Cheshire County [005], New Hampshire [33]
Owned by State Highway Agency [01], DOT District: 4
AT VERMONT STATE LINE
Condition
Deck: Good [7]
Superstructure: Poor [4]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 40.9 metric ton = 45.0 tons (Load Factor(LF) [1])
Inventory: 24.5 metric ton = 27.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 8
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 2.4 km = 1.5 mi
Traffic
ADT: 8183 (2019) and Trucks: 4%
Future ADT: 12110 (In 2041 )
US 00005 ML over WHETSTONE BROOK (Route: 5)
Num:202000000713022x
Open: no restriction [A]
Built: 1938, Reconstructed: 2003
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 20.4 m = 66.9 ft
Main Spans: 1 at 18.6 m = 61.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 17.9 m = 58.7 ft (3 Lanes) and Out-To-Out: 23.5 m = 77.1 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Brattleboro [07975]: Windham County [025], Vermont [50]
Owned by City or Municipal Highway Agency [04], DOT District: 2
0.1 MI N JCT. VT.142
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 70.2 metric ton = 77.2 tons (Load Factor(LF) [1])
Inventory: 42.3 metric ton = 46.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 17500 (2018) and Trucks: 2%
Future ADT: 18375 (In 2028 )
NH119 over CONNECTICUT RIVER (Route: 119)
Num:12500420004400x
Open: no restriction [A]
Built: 1920, Reconstructed: 1988
Historic: Bridge is possibly eligible for the NRHP. [3]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Girder and floorbeam system [03]
Deck: Concrete Precast Panels [2] with Wearing Surface:
Bridge Dimensions
Length: 90.5 m = 296.9 ft
Main Spans: 1 at 61 m = 200.1 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 6.2 m = 20.3 ft (2 Lanes) and Out-To-Out: 6.4 m = 21.0 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 3.7 m = 12.1 ft and Navigational Clearance: 0 = N/A
Location
Hinsdale [36660]: Cheshire County [005], New Hampshire [33]
Owned by State Highway Agency [01], DOT District: 4
0.3 MI E VERMONT SL
Condition
Deck: Good [7]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 64.4 metric ton = 70.8 tons (Load Factor(LF) [1])
Inventory: 38.6 metric ton = 42.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: July 2020 [0720] and Frequency: 8
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 2.6 km = 1.6 mi
Traffic
ADT: 8183 (2019) and Trucks: 4%
Future ADT: 12110 (In 2041 )
CITY 00ELM over WHETSTONE BROOK (Route: 0)
Num:202014003213022x
Open: no restriction [A]
Built: 1966, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 27.1 m = 88.9 ft
Main Spans: 1 at 25.9 m = 85.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.3 m = 30.5 ft (2 Lanes) and Out-To-Out: 10.1 m = 33.1 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Brattleboro [07975]: Windham County [025], Vermont [50]
Owned by City or Municipal Highway Agency [04], DOT District: 2
ELM ST
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 86.4 metric ton = 95.0 tons (Load Factor(LF) [1])
Inventory: 43.2 metric ton = 47.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 3600 (2016) and Trucks: 11%
Future ADT: 3780 (In 2026 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider