Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Gravel [8]
Bridge Dimensions
Length: 7.9 m = 25.9 ft
Main Spans: 1 at 7 m = 23.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5.5 m = 18.0 ft (2 Lanes) and Out-To-Out: 5.5 m = 18.0 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Saint Clair [70700]: St. Clair County [147], Michigan [26]
Owned by County Highway Agency [02], DOT District: 4
SEC. 5-8 ST. CLAIR TWP
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 67.7 metric ton = 74.5 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 40.5 metric ton = 44.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 130 (1994) and Trucks: 3%
Future ADT: 255 (In 2014
)