Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 36.3 m = 119.1 ft
Main Spans: 1 at 35.7 m = 117.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12 m = 39.4 ft (2 Lanes) and Out-To-Out: 13 m = 42.7 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Alexander [01165]: Genesee County [037], New York [36]
Owned by State Highway Agency [01], DOT District: 41
JCT RTE 20 + TONAWANDA CK
Condition
Deck: Excellent [9]
Superstructure: Excellent [9]
Substructure: Excellent [9]
Loading
Design: HL93 [A]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 68 metric ton = 74.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Superior to present desirable criteria [9]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 2.5 km = 1.6 mi
Traffic
ADT: 3620 (2017) and Trucks: 26%
Future ADT: 3654 (In 2039
)