COUNTY RD 1 over CANYON CREEK (Route: 0)
Num:19C467 1 326x
Open: no restriction [A]
Built: 1954, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 37.2 m = 122.1 ft
Main Spans: 3 at 14.6 m = 47.9 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 11.9 m = 39.0 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Canyonville [11000]: Douglas County [019], Oregon [41]
Owned by County Highway Agency [02], DOT District: 7
0.5 MI E OF CANYONVILLE
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 39.9 metric ton = 43.9 tons (Load Factor(LF) [1])
Inventory: 23.6 metric ton = 26.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 5291 (2020) and Trucks: 15%
Future ADT: 5981 (In 2025 )
I-5 (HWY 001) over 5TH ST (Route: 5)
Num:20477 001 09828x
Open: no restriction [A]
Built: 2008, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 20.4 m = 66.9 ft
Main Spans: 1 at 20.4 m = 66.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 31.2 m = 102.4 ft (4 Lanes) and Out-To-Out: 32.8 m = 107.6 ft for a 31.2 m = 102.4 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Canyonville [11000]: Douglas County [019], Oregon [41]
Owned by State Highway Agency [01], DOT District: 7
00.3 MI N SCL CANYONVILLE
Condition
Deck: Satisfactory [6]
Superstructure: Very Good [8]
Substructure: Satisfactory [6]
Loading
Design: HL93 [A]
Operating: 63.8 metric ton = 70.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 49.2 metric ton = 54.1 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 21900 (2018) and Trucks: 32%
Future ADT: 28800 (In 2038 )
SO. MAIN STREET over CANYON CREEK (Route: 0)
Num:00548A000 00000x
Open: no restriction [A]
Built: 1921, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 27.4 m = 89.9 ft
Main Spans: 2 at 13.7 m = 44.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 5.9 m = 19.4 ft (2 Lanes) and Out-To-Out: 7 m = 23.0 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Canyonville [11000]: Douglas County [019], Oregon [41]
Owned by City or Municipal Highway Agency [04], DOT District: 7
CITY OF CANYONVILLE
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 44.4 metric ton = 48.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 34.3 metric ton = 37.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 4363 (2020) and Trucks: 1%
Future ADT: 4933 (In 2025 )
I-5 (HWY 001) over FIRST ST (Route: 5)
Num:07324 001 09851x
Open: no restriction [A]
Built: 1951, Reconstructed: 1966
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 27 m = 88.6 ft
Main Spans: 3 at 11 m = 36.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 26.7 m = 87.6 ft (5 Lanes) and Out-To-Out: 28.7 m = 94.2 ft for a 26.7 m = 87.6 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Canyonville [11000]: Douglas County [019], Oregon [41]
Owned by State Highway Agency [01], DOT District: 7
00.6 MI N CANYONVILLE SCL
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 43.5 metric ton = 47.9 tons (Load Factor(LF) [1])
Inventory: 26.3 metric ton = 28.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 21900 (2018) and Trucks: 32%