Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 68.3 m = 224.1 ft
Main Spans: 3 at 24.9 m = 81.7 ft
Approach Spans: 0
Skew: 16
Width, Roadway: 20.8 m = 68.2 ft (4 Lanes) and Out-To-Out: 21.7 m = 71.2 ft for a 21.3 m = 69.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Phelps [57529]: Ontario County [069], New York [36]
Owned by State Highway Agency [01], DOT District: 44
4.1 MI N OF GENEVA
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 86.2 metric ton = 94.8 tons (Load Factor(LF) [1])
Inventory: 51.7 metric ton = 56.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Superior to present desirable criteria [9]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 7124 (2018) and Trucks: 14%
Future ADT: 7168 (In 2039
)