Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 124.1 m = 407.2 ft
Main Spans: 1 at 79.2 m = 259.9 ft
Approach Spans: 1
Skew: 0
Width, Roadway: 11.9 m = 39.0 ft (3 Lanes) and Out-To-Out: 15.8 m = 51.8 ft for a 11.9 m = 39.0 ft approaching roadway.
Vertical Clearance: 5.07 m = 16.6 ft and Navigational Clearance: 6 m = 19.7 ft
Location
Fultonville [27859]: Montgomery County [057], New York [36]
Owned by State Highway Agency [01], DOT District: 25
.4 MI S JCT SH 5 & SH 30A
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 61.7 metric ton = 67.9 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 1.9 km = 1.2 mi
Traffic
ADT: 11915 (2016) and Trucks: 16%
Future ADT: 11971 (In 2039
)