HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 3


ARLENE DRIVE over I-75 (Route: 0)
Num:2498x
Open: no restriction [A]
Built: 1957, Reconstructed: 2010
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 57 m = 187.0 ft
Main Spans: 4 at 17.1 m = 56.1 ft
Approach Spans: 0
Skew: 17
Width, Roadway: 10.4 m = 34.1 ft (2 Lanes) and Out-To-Out: 11.1 m = 36.4 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29020]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
S OF M-21
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 85.5 metric ton = 94.1 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 51.2 metric ton = 56.3 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 220 (1988) and Trucks: 0%
Future ADT: 253 (In 2008 )
M-21 over I-75 (Route: 21)
Num:2499x
Open: no restriction [A]
Built: 2009, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 62.6 m = 205.4 ft
Main Spans: 2 at 32.4 m = 106.3 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 23.2 m = 76.1 ft (6 Lanes) and Out-To-Out: 28.5 m = 93.5 ft for a 23.2 m = 76.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29020]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
NEAR W LTS OF FLINT
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: HL93 [A]
Operating: 76.1 metric ton = 83.7 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 34.7 metric ton = 38.2 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 2020 [0220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 27203 (2007) and Trucks: 1%
Future ADT: 24000 (In 2028 )
I-75 over COURT ST (Route: 75)
Num:2500x
Open: would be posted or closed except for temporary shoring [D]
Built: 1957, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 32.6 m = 107.0 ft
Main Spans: 3 at 12.6 m = 41.3 ft
Approach Spans: 0
Skew: 9
Width, Roadway: 32 m = 105.0 ft (6 Lanes) and Out-To-Out: 33.8 m = 110.9 ft for a 33.2 m = 108.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Flint [29020]: Genesee County [049], Michigan [26]
Owned by State Highway Agency [01], DOT District: 4
N OF M-21
Condition
Deck: Fair [5]
Superstructure: Serious [3]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 77.8 metric ton = 85.6 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Inventory: 46.3 metric ton = 50.9 tons (Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading [6])
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 10
Future Work
Work Needed:
Bridge Detour: 1.1 km = 0.7 mi
Traffic
ADT: 70414 (2007) and Trucks: 10%
Future ADT: 100051 (In 2018 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider