HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


RTE 51 over RTE 5: N Y S BARGE CANAL (Route: 51)
Num:4051180x
Open: no restriction [A]
Built: 1968, Reconstructed: 2019
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 212.4 m = 696.9 ft
Main Spans: 7 at 56.3 m = 184.7 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (2 Lanes) and Out-To-Out: 11.1 m = 36.4 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 4.8 m = 15.7 ft and Navigational Clearance: 6 m = 19.7 ft
Location
Herkimer [34132]: Herkimer County [043], New York [36]
Owned by State Highway Agency [01], DOT District: 23
JCT RTS 5+51 N OF ILION
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 55.3 metric ton = 60.8 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 6693 (2015) and Trucks: 3%
Future ADT: 8130 (In 2039 )
RTE 51 over CSX TRANS/AMTRAK (Route: 51)
Num:00000000405118Ax
Open: no restriction [A]
Built: 1968, Reconstructed: 2019
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 182.9 m = 600.1 ft
Main Spans: 6 at 27.4 m = 89.9 ft
Approach Spans: 0
Skew: 26
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 8.2 m = 26.9 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 4.64 m = 15.2 ft and Navigational Clearance: 0 = N/A
Location
Herkimer [34132]: Herkimer County [043], New York [36]
Owned by State Highway Agency [01], DOT District: 23
JCT RTS 5 & 51 N OF ILION
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 92.2 metric ton = 101.4 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 887 (2017) and Trucks: 7%
Future ADT: 891 (In 2039 )
RTE 51 over CSX TRANS/AMTRAK (Route: 51)
Num:00000000405118Bx
Open: no restriction [A]
Built: 1968, Reconstructed: 2019
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 112.2 m = 368.1 ft
Main Spans: 4 at 28.3 m = 92.9 ft
Approach Spans: 0
Skew: 20
Width, Roadway: 6.7 m = 22.0 ft (1 Lanes) and Out-To-Out: 8.2 m = 26.9 ft for a 6.7 m = 22.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Herkimer [34132]: Herkimer County [043], New York [36]
Owned by State Highway Agency [01], DOT District: 23
JCT RTS 5 & 51 N OF ILION
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 83.8 metric ton = 92.2 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 6199 (2013) and Trucks: 6%
Future ADT: 6228 (In 2039 )
RTE 5S over RTE 51 (Route: 5)
Num:1074020x
Open: no restriction [A]
Built: 1989, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 35.4 m = 116.1 ft
Main Spans: 1 at 34.1 m = 111.9 ft
Approach Spans: 0
Skew: 5
Width, Roadway: 13.4 m = 44.0 ft (3 Lanes) and Out-To-Out: 14.6 m = 47.9 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Ilion [37275]: Herkimer County [043], New York [36]
Owned by State Highway Agency [01], DOT District: 23
0.3M N RTS 5S & 51-OVER51
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 85.3 metric ton = 93.8 tons (Load Factor(LF) [1])
Inventory: 50.8 metric ton = 55.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 1999 [499] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 11887 (2016) and Trucks: 7%
Future ADT: 14834 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider