Bridge Type
Main Span(s): Concrete continuous [2] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 9.4 m = 30.8 ft
Main Spans: 2 at 4 m = 13.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.9 m = 35.8 ft (2 Lanes) and Out-To-Out: 11.6 m = 38.1 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Schuyler [65695]: Herkimer County [043], New York [36]
Owned by State Highway Agency [01], DOT District: 23
3.5 MI W JCT SH 5 & CR 5
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 74.2 metric ton = 81.6 tons ()
Inventory: 19.6 metric ton = 21.6 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: March 2020 [0320] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 1.2 km = 0.7 mi
Traffic
ADT: 6219 (2019) and Trucks: 9%
Future ADT: 6248 (In 2039
)