Nearby Bridges in NBI 2021: 5


RTE I190 over BURNT SHIP CREEK (Route: 190)
Num:5045762x
Open: no restriction [A]
Built: 1963, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 76.2 m = 250.0 ft
Main Spans: 3 at 19.8 m = 65.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.4 m = 37.4 ft (2 Lanes) and Out-To-Out: 14.3 m = 46.9 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Grand Island [29828]: Erie County [029], New York [36]
Owned by State Toll Authority [31], DOT District: 53
1.1 MI S INT 21 ON I-90
Condition
Deck: Not Applicable [N]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design:
Operating: 83.5 metric ton = 91.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 29269 (2014) and Trucks: 11%
Future ADT: 32801 (In 2039 )
RTE I190 over BURNT SHIP CREEK (Route: 190)
Num:5045761x
Open: no restriction [A]
Built: 1935, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 76.2 m = 250.0 ft
Main Spans: 3 at 19.8 m = 65.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 13.9 m = 45.6 ft (2 Lanes) and Out-To-Out: 16.8 m = 55.1 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Grand Island [29828]: Erie County [029], New York [36]
Owned by State Toll Authority [31], DOT District: 53
1.1 MI S INT 21 ON I-90
Condition
Deck: Not Applicable [N]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design:
Operating: 53.5 metric ton = 58.9 tons ()
Inventory: 13.7 metric ton = 15.1 tons ()
Appraisal
Structural: Basically intolerable requiring high priority of corrrective action [3]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 28012 (2014) and Trucks: 14%
Future ADT: 0 (In 2034 )
RTE I190 over NIAGARA RIVER: Niagara S (Route: 190)
Num:5045752x
Open: no restriction [A]
Built: 1935, Reconstructed: 1991
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Truss - Deck [09]
Approach Span(s): Steel [3] Girder and floorbeam system [03]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 1233.8 m = 4048.1 ft
Main Spans: 11 at 152.4 m = 500.0 ft
Approach Spans: 5
Skew: 0
Width, Roadway: 7.6 m = 24.9 ft (2 Lanes) and Out-To-Out: 8.1 m = 26.6 ft for a 11.6 m = 38.1 ft approaching roadway.
Vertical Clearance: 5.33 m = 17.5 ft and Navigational Clearance: 12.1 m = 39.7 ft
Location
Grand Island [29828]: Erie County [029], New York [36]
Owned by State Toll Authority [31], DOT District: 53
INT EXIT 21 ON 190I
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 53.5 metric ton = 58.9 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 20420 (2018) and Trucks: 10%
Future ADT: 22884 (In 2039 )
RTE I190 over NIAGARA RIVER: Niagara S (Route: 190)
Num:5045751x
Open: no restriction [A]
Built: 1963, Reconstructed: 2013
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Truss - Deck [09]
Approach Span(s): Steel [3] Girder and floorbeam system [03]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 1229.3 m = 4033.3 ft
Main Spans: 11 at 152.4 m = 500.0 ft
Approach Spans: 5
Skew: 0
Width, Roadway: 7.5 m = 24.6 ft (2 Lanes) and Out-To-Out: 8.1 m = 26.6 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 5.33 m = 17.5 ft and Navigational Clearance: 12.2 m = 40.0 ft
Location
Grand Island [29828]: Erie County [029], New York [36]
Owned by State Toll Authority [31], DOT District: 53
INT EXIT 21 ON 190I
Condition
Deck: Excellent [9]
Superstructure: Fair [5]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 51.7 metric ton = 56.9 tons (Load Factor(LF) [1])
Inventory: 32.7 metric ton = 36.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: November 1999 [1199] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 28012 (2014) and Trucks: 14%
Future ADT: 0 (In 2034 )
RTE 957C over 190IX: RTE I190 (Route: 957)
Num:1045770x
Open: no restriction [A]
Built: 2000, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 65.8 m = 215.9 ft
Main Spans: 2 at 32.6 m = 107.0 ft
Approach Spans: 0
Skew: 12
Width, Roadway: 11.2 m = 36.7 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 11.3 m = 37.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Grand Island [29828]: Erie County [029], New York [36]
Owned by State Toll Authority [31], DOT District: 53
INT 20 ON I-190
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 41.1 metric ton = 45.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 31.8 metric ton = 35.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 721 (2019) and Trucks: 1%
Future ADT: 892 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.