Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 38.4 m = 126.0 ft
Main Spans: 1 at 37 m = 121.4 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.6 m = 31.5 ft (2 Lanes) and Out-To-Out: 13.7 m = 44.9 ft for a 9.6 m = 31.5 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Greenwich [30675]: Washington County [115], New York [36]
Owned by State Highway Agency [01], DOT District: 18
RTE 372 IN GREENWICH
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 71 metric ton = 78.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Basically intolerable requiring high priority of corrrective action [3]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 1999 [1099] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 3357 (2018) and Trucks: 6%
Future ADT: 3580 (In 2039
)