Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 51.2 m = 168.0 ft
Main Spans: 3 at 20.4 m = 66.9 ft
Approach Spans: 0
Skew: 37
Width, Roadway: 33.6 m = 110.2 ft (4 Lanes) and Out-To-Out: 34.4 m = 112.9 ft for a 31.7 m = 104.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Salina [64815]: Onondaga County [067], New York [36]
Owned by State Toll Authority [31], DOT District: 33
.6 MI W JCT370<90I ON 90I
Condition
Deck: Good [7]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 56.2 metric ton = 61.8 tons (Load Factor(LF) [1])
Inventory: 33.6 metric ton = 37.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.4 km = 0.2 mi
Traffic
ADT: 35373 (2014) and Trucks: 9%
Future ADT: 51025 (In 2039
)