Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 64.6 m = 212.0 ft
Main Spans: 2 at 31.4 m = 103.0 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 32.9 m = 107.9 ft (4 Lanes) and Out-To-Out: 34.4 m = 112.9 ft for a 31.1 m = 102.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Whitestown [81754]: Oneida County [065], New York [36]
Owned by State Toll Authority [31], DOT District: 26
8 MI W EXIT 31 OF I90
Condition
Deck: Satisfactory [6]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 72.6 metric ton = 79.9 tons (Load Factor(LF) [1])
Inventory: 43.5 metric ton = 47.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 1.6 km = 1.0 mi
Traffic
ADT: 23229 (2018) and Trucks: 26%
Future ADT: 26764 (In 2039
)