HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


E STATE ST over WILLOW CREEK (Route: 0)
Num:7990x
Open: no restriction [A]
Built: 1920, Reconstructed: N/A [0000]
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 18.9 m = 62.0 ft
Main Spans: 1 at 18.9 m = 62.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 11.3 m = 37.1 ft (2 Lanes) and Out-To-Out: 15.6 m = 51.2 ft for a 11.3 m = 37.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [04822]: Cerro Gordo County [033], Iowa [19]
Owned by City or Municipal Highway Agency [04], DOT District: 0
0
Condition
Deck: Not Applicable [N]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 45.4 metric ton = 49.9 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 6700 (2009) and Trucks: 0%
Future ADT: 6700 (In 2040 )
N CAROLINA AVE over WINNEBAGO RIVER (Route: 0)
Num:8140x
Open: no restriction [A]
Built: 1914, Reconstructed: 2003
Historic: Bridge is on the NRHP. [1]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 35.4 m = 116.1 ft
Main Spans: 2 at 17.1 m = 56.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.7 m = 35.1 ft (2 Lanes) and Out-To-Out: 14.9 m = 48.9 ft for a 10.7 m = 35.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [04822]: Cerro Gordo County [033], Iowa [19]
Owned by City or Municipal Highway Agency [04], DOT District: 0
0
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 44.4 metric ton = 48.8 tons ()
Inventory: 32.7 metric ton = 36.0 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 2320 (2017) and Trucks: 0%
Future ADT: 2320 (In 2040 )
4TH ST NE over WILLOW CREEK (Route: 0)
Num:501080x
Open: no restriction [A]
Built: 1961, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 9.8 m = 32.2 ft
Main Spans: 3 at 3 m = 9.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 0 m = 0.0 ft (2 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 10.4 m = 34.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [04822]: Cerro Gordo County [033], Iowa [19]
Owned by City or Municipal Highway Agency [04], DOT District: 0
0
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: M 13.5 / H 15 [2]
Operating: 20.4 metric ton = 22.4 tons ()
Inventory: 16.3 metric ton = 17.9 tons ()
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: N/A [N]
Road Alignment: Better than present minimum criteria [7]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 1161 (2015) and Trucks: 0%
Future ADT: 1161 (In 2040 )
S PENN AVE over WILLOW CREEK (Route: 0)
Num:8121x
Open: no restriction [A]
Built: 1981, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.8 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 65.8 m = 215.9 ft
Main Spans: 3 at 23.5 m = 77.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12.3 m = 40.4 ft (2 Lanes) and Out-To-Out: 18.4 m = 60.4 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [04822]: Cerro Gordo County [033], Iowa [19]
Owned by City or Municipal Highway Agency [04], DOT District: 0
0
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 69.8 metric ton = 76.8 tons (Allowable Stress(AS) [2])
Inventory: 27.2 metric ton = 29.9 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: January 2020 [0120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 4150 (2013) and Trucks: 0%
Future ADT: 4150 (In 2040 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider