Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 36 m = 118.1 ft
Main Spans: 1 at 34.4 m = 112.9 ft
Approach Spans: 0
Skew: 13
Width, Roadway: 12.2 m = 40.0 ft (2 Lanes) and Out-To-Out: 12.9 m = 42.3 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 5.5 m = 18.0 ft
Location
Gates [28442]: Monroe County [055], New York [36]
Owned by State Highway Agency [01], DOT District: 43
JCT BARGEC+31 W SIDE ROCH
Condition
Deck: Fair [5]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 59 metric ton = 64.9 tons (Load Factor(LF) [1])
Inventory: 35.4 metric ton = 38.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Meets minimum tolerable limits to be left in place as is [4] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 14289 (2019) and Trucks: 10%
Future ADT: 17358 (In 2039
)