Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 19.7 m = 64.6 ft
Main Spans: 1 at 18.9 m = 62.0 ft
Approach Spans: 0
Skew: 15
Width, Roadway: 14.6 m = 47.9 ft (2 Lanes) and Out-To-Out: 20.7 m = 67.9 ft for a 14.6 m = 47.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Menomonee Falls [51000]: Waukesha County [133], Wisconsin [55]
Owned by City or Municipal Highway Agency [04], DOT District: 2
0.1M E JCT STH 175
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 65 metric ton = 71.5 tons (Load Factor(LF) [1])
Inventory: 37.3 metric ton = 41.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 10000 (2018) and Trucks: 3%
Future ADT: 12000 (In 2038
)