Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 71 m = 233.0 ft
Main Spans: 2 at 37.5 m = 123.0 ft
Approach Spans: 0
Skew: 58
Width, Roadway: 21 m = 68.9 ft (5 Lanes) and Out-To-Out: 25.6 m = 84.0 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Concord [14200]: Merrimack County [013], New Hampshire [33]
Owned by City or Municipal Highway Agency [04], DOT District: 5
0.3 MI WEST OF JCT I-93
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 81.5 metric ton = 89.7 tons (Load Factor(LF) [1])
Inventory: 48.8 metric ton = 53.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 21038 (2019) and Trucks: 0%
Future ADT: 31136 (In 2041
)