Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 173.7 m = 569.9 ft
Main Spans: 4 at 50.9 m = 167.0 ft
Approach Spans: 0
Skew: 12
Width, Roadway: 10.9 m = 35.8 ft (2 Lanes) and Out-To-Out: 11.8 m = 38.7 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 11.5 m = 37.7 ft
Location
Rome [63418]: Oneida County [065], New York [36]
Owned by State Highway Agency [01], DOT District: 26
0.6 MI S JCT RTS 46 & 26
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 78 metric ton = 85.8 tons (Load Factor(LF) [1])
Inventory: 47.2 metric ton = 51.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 9016 (2017) and Trucks: 6%
Future ADT: 9058 (In 2039
)