OR 138 (HWY 138)EB over SOUTH UMPQUA RIVER (Route: 138)
Num:07016A000 00000x
Open: no restriction [A]
Built: 1971, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 201.2 m = 660.1 ft
Main Spans: 3 at 79.2 m = 259.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.7 m = 28.5 ft (2 Lanes) and Out-To-Out: 12.5 m = 41.0 ft for a 8.7 m = 28.5 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Roseburg [63650]: Douglas County [019], Oregon [41]
Owned by State Highway Agency [01], DOT District: 7
0.2 MI E. OF I-5
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 51.7 metric ton = 56.9 tons (Load Factor(LF) [1])
Inventory: 30.8 metric ton = 33.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 18300 (2018) and Trucks: 7%
Future ADT: 24800 (In 2038 )
I-5 (HWY 001) over I-5 @ HARVARD AVE (Route: 5)
Num:07669A001 12415x
Open: no restriction [A]
Built: 1976, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 57.3 m = 188.0 ft
Main Spans: 3 at 29.6 m = 97.1 ft
Approach Spans: 0
Skew: 19
Width, Roadway: 34.8 m = 114.2 ft (6 Lanes) and Out-To-Out: 37 m = 121.4 ft for a 34.8 m = 114.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Roseburg [63650]: Douglas County [019], Oregon [41]
Owned by State Highway Agency [01], DOT District: 7
00.2 MI N OF ROSEBURG SCL
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 78 metric ton = 85.8 tons (Load Factor(LF) [1])
Inventory: 46.3 metric ton = 50.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 51000 (2018) and Trucks: 28%
Future ADT: 65600 (In 2038 )
OR 138 (HWY 138)WB over SOUTH UMPQUA RIVER (Route: 138)
Num:08899 000 00000x
Open: no restriction [A]
Built: 1961, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 276.8 m = 908.2 ft
Main Spans: 4 at 48.8 m = 160.1 ft
Approach Spans: 6
Skew: 0
Width, Roadway: 9.1 m = 29.9 ft (2 Lanes) and Out-To-Out: 11.7 m = 38.4 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Roseburg [63650]: Douglas County [019], Oregon [41]
Owned by State Highway Agency [01], DOT District: 7
0.2 MI E OF I-5
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 26.2 metric ton = 28.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 20.4 metric ton = 22.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 12100 (2018) and Trucks: 2%
Future ADT: 14600 (In 2038 )
I-5 (HWY 001) over I-5 @ BELLOWS ST (Route: 5)
Num:07668A001 12422x
Open: no restriction [A]
Built: 1976, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 54.3 m = 178.2 ft
Main Spans: 3 at 22.6 m = 74.2 ft
Approach Spans: 0
Skew: 42
Width, Roadway: 28 m = 91.9 ft (5 Lanes) and Out-To-Out: 30 m = 98.4 ft for a 28 m = 91.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Roseburg [63650]: Douglas County [019], Oregon [41]
Owned by State Highway Agency [01], DOT District: 7
00.3 MI N OF ROSEBURG SCL
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 70.8 metric ton = 77.9 tons (Load Factor(LF) [1])
Inventory: 42.6 metric ton = 46.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 51000 (2018) and Trucks: 28%
Future ADT: 65600 (In 2038 )
I-5 (HWY 001) CON over I-5 @ BELLOWS ST (Route: 5)
Num:07668B001C12424x
Open: no restriction [A]
Built: 1976, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 52.1 m = 170.9 ft
Main Spans: 3 at 22.3 m = 73.2 ft
Approach Spans: 0
Skew: 49
Width, Roadway: 7.9 m = 25.9 ft (1 Lanes) and Out-To-Out: 9.3 m = 30.5 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Roseburg [63650]: Douglas County [019], Oregon [41]
Owned by State Highway Agency [01], DOT District: 7
00.3 MI N OF ROSEBURG SCL
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 28.8 metric ton = 31.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 22.4 metric ton = 24.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present desirable criteria [8]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: February 1999 [299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 11350 (2019) and Trucks: 7%
Future ADT: 9343 (In 2030 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider