Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Concrete [1] Slab [01]
Deck: Not applicable [N] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 48.8 m = 160.1 ft
Main Spans: 1 at 36.2 m = 118.8 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 4.5 m = 14.8 ft (1 Lanes) and Out-To-Out: 5 m = 16.4 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 4.6 m = 15.1 ft
Location
Brockport [08466]: Monroe County [055], New York [36]
Owned by Town or Township Highway Agency [03], DOT District: 43
.3 MI W JCT BRGE C & SH19
Condition
Deck: Very Good [8]
Superstructure: Good [7]
Substructure: Very Good [8]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 39 metric ton = 42.9 tons (Load Factor(LF) [1])
Inventory: 23.6 metric ton = 26.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Basically intolerable requiring high priority of replacement [2]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 12
Future Work
Work Needed: Bridge deck replacement with only incidental widening. [37]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 818 (2019) and Trucks: 2%
Future ADT: 1012 (In 2039
)