Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 25.6 m = 84.0 ft
Main Spans: 1 at 24.7 m = 81.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 3.9 m = 12.8 ft (1 Lanes) and Out-To-Out: 4.7 m = 15.4 ft for a 4.9 m = 16.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Pawlet [54250]: Rutland County [021], Vermont [50]
Owned by Town or Township Highway Agency [03], DOT District: 1
0.25 MI TO JCT W VT30
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design:
Operating: 43.2 metric ton = 47.5 tons (Load Factor(LF) [1])
Inventory: 26.1 metric ton = 28.7 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 2.9 km = 1.8 mi
Traffic
ADT: 150 (2019) and Trucks: 5%
Future ADT: 158 (In 2029
)