HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


LRD WISCONSIN AVE over SAUK CREEK (Route: 0)
Num:B45006800000000x
Open: no restriction [A]
Built: 1981, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 18.9 m = 62.0 ft
Main Spans: 1 at 18.1 m = 59.4 ft
Approach Spans: 0
Skew: 7
Width, Roadway: 10.6 m = 34.8 ft (2 Lanes) and Out-To-Out: 13.9 m = 45.6 ft for a 12.2 m = 40.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Port Washington [64450]: Ozaukee County [089], Wisconsin [55]
Owned by City or Municipal Highway Agency [04], DOT District: 2
0.1M S JCT STH 32
Condition
Deck: Satisfactory [6]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 65 metric ton = 71.5 tons (Load Factor(LF) [1])
Inventory: 37.3 metric ton = 41.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 2500 (2018) and Trucks: 0%
Future ADT: 1916 (In 2039 )
S. WISCONSIN STREE over SAUK CREEK TRIBUTARY (Route: 0)
Num:P45090900000000x
Open: no restriction [A]
Built: 1986, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Culvert [19]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 11.2 m = 36.7 ft
Main Spans: 3 at 2.3 m = 7.5 ft
Approach Spans: 0
Skew: 40
Width, Roadway: 0 m = 0.0 ft (2 Lanes) and Out-To-Out: 0 m = 0.0 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Port Washington [64450]: Ozaukee County [089], Wisconsin [55]
Owned by City or Municipal Highway Agency [04], DOT District: 2
.05 MI S. OF CHESTNUT
Condition
Deck: Not Applicable [N]
Superstructure: Not Applicable [N]
Substructure: Not Applicable [N]
Loading
Design: MS 18 / HS 20 [5]
Operating: 35.9 metric ton = 39.5 tons (Load Factor(LF) [1])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 1 (2017) and Trucks: 0%
Future ADT: 1 (In 2039 )
LRD S. WISCONSIN S over MINERAL SPRING CR OVERFL (Route: 0)
Num:P45090800000000x
Open: no restriction [A]
Built: 2002, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 8.5 m = 27.9 ft
Main Spans: 1 at 8.5 m = 27.9 ft
Approach Spans: 0
Skew: 28
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 8.5 m = 27.9 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Port Washington [64450]: Ozaukee County [089], Wisconsin [55]
Owned by City or Municipal Highway Agency [04], DOT District: 2
0.1M S OF CHESTNUT ROAD
Condition
Deck: Not Applicable [N]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 18 / HS 20 [5]
Operating: 53.9 metric ton = 59.3 tons ()
Inventory: 32.4 metric ton = 35.6 tons ()
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 216 (2018) and Trucks: 0%
Future ADT: 237 (In 2039 )
STH 32-GRAND AVE over SAUK CREEK (Route: 32)
Num:B45000200000000x
Open: no restriction [A]
Built: 1915, Reconstructed: 1928
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 23.8 m = 78.1 ft
Main Spans: 1 at 18.3 m = 60.0 ft
Approach Spans: 0
Skew: 18
Width, Roadway: 15.8 m = 51.8 ft (4 Lanes) and Out-To-Out: 21 m = 68.9 ft for a 15.8 m = 51.8 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Port Washington [64450]: Ozaukee County [089], Wisconsin [55]
Owned by City or Municipal Highway Agency [04], DOT District: 2
0.5M N JCT STH 33
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 53.9 metric ton = 59.3 tons (Load Factor(LF) [1])
Inventory: 32.4 metric ton = 35.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 10200 (2019) and Trucks: 3%
Future ADT: 12177 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider