Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface:
Bridge Dimensions
Length: 39.9 m = 130.9 ft
Main Spans: 1 at 38.1 m = 125.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 6 m = 19.7 ft (2 Lanes) and Out-To-Out: 6.5 m = 21.3 ft for a 6.4 m = 21.0 ft approaching roadway.
Vertical Clearance: 4.55 m = 14.9 ft and Navigational Clearance: 0 = N/A
Location
Wallingford [75925]: Rutland County [021], Vermont [50]
Owned by Town or Township Highway Agency [03], DOT District: 3
0.3 MI W JCT. U.S.7
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design:
Operating: 33.3 metric ton = 36.6 tons (Allowable Stress(AS) [2])
Inventory: 20.7 metric ton = 22.8 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 2.9 km = 1.8 mi
Traffic
ADT: 1200 (2017) and Trucks: 6%
Future ADT: 1260 (In 2027
)