Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 30.8 m = 101.1 ft
Main Spans: 1 at 29.4 m = 96.5 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 10.8 m = 35.4 ft (2 Lanes) and Out-To-Out: 13.1 m = 43.0 ft for a 10.7 m = 35.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Whitehall [81622]: Washington County [115], New York [36]
Owned by State Highway Agency [01], DOT District: 18
.4 MI E JCT RTS 22 & 273
Condition
Deck: Satisfactory [6]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 99.9 metric ton = 109.9 tons (Load Factor(LF) [1])
Inventory: 57.2 metric ton = 62.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 9050 (2016) and Trucks: 15%
Future ADT: 10139 (In 2039
)