Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 19.5 m = 64.0 ft
Main Spans: 1 at 18.6 m = 61.0 ft
Approach Spans: 0
Skew: 36
Width, Roadway: 7.8 m = 25.6 ft (2 Lanes) and Out-To-Out: 8.6 m = 28.2 ft for a 6.1 m = 20.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Proctor [57250]: Rutland County [021], Vermont [50]
Owned by State Highway Agency [01], DOT District: 3
0.15 MI TO JCT W CL2 TH2
Condition
Deck: Serious [3]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design:
Operating: 0 metric ton = 0.0 tons (Load Factor(LF) [1])
Inventory: 0 metric ton = 0.0 tons (Load Factor(LF) [1])
Appraisal
Structural:
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Better than present minimum criteria [7]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: April 2020 [0420] and Frequency: 12
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 500 (2019) and Trucks: 2%
Future ADT: 525 (In 2029
)