HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 10


I295 & US 1A over BACK BAY (ATLANTIC O) (Route: 295)
Num:3088x
Open: no restriction [A]
Built: 1960, Reconstructed: 2011
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.4 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 153.9 m = 504.9 ft
Main Spans: 4 at 42.4 m = 139.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 29.3 m = 96.1 ft (6 Lanes) and Out-To-Out: 42.6 m = 139.8 ft for a 34.1 m = 111.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 9.1 m = 29.9 ft
Location
Portland [60545]: Cumberland County [005], Maine [23]
Owned by State Highway Agency [01], DOT District: 1
1.6 MI S TOWNLINE
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: Other [C]
Operating: 49.6 metric ton = 54.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 38.2 metric ton = 42.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: November 2020 [1120] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 43800 (2016) and Trucks: 10%
Future ADT: 61320 (In 2036 )
US1 (BAXTER BLVD) over I295 & WASH AVE NB & SB (Route: 0)
Num:815x
Open: no restriction [A]
Built: 1987, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Segmental box girder [21]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 146.3 m = 480.0 ft
Main Spans: 4 at 45.4 m = 149.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (1 Lanes) and Out-To-Out: 9.7 m = 31.8 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [60545]: Cumberland County [005], Maine [23]
Owned by State Highway Agency [01], DOT District: 1
0.1 MI E NB & SB DIVERGE
Condition
Deck: Good [7]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 42.1 metric ton = 46.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 32.4 metric ton = 35.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 3000 (2016) and Trucks: 10%
Future ADT: 4200 (In 2036 )
RTE 26 NB(9WASH.AV over EAST COMMERCIAL ST (Route: 26)
Num:5915x
Open: no restriction [A]
Built: 1960, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 55.2 m = 181.1 ft
Main Spans: 3 at 21.3 m = 69.9 ft
Approach Spans: 0
Skew: 21
Width, Roadway: 9.9 m = 32.5 ft (1 Lanes) and Out-To-Out: 11 m = 36.1 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [60545]: Cumberland County [005], Maine [23]
Owned by State Highway Agency [01], DOT District: 1
0.2 MI N OF INT MARG.WAY
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 42.4 metric ton = 46.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 32.7 metric ton = 36.0 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 5790 (2016) and Trucks: 10%
Future ADT: 8106 (In 2036 )
I-295 NB&SB over RTE 26 (WASH AVE) N B (Route: 295)
Num:816x
Open: no restriction [A]
Built: 1987, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Segmental box girder [21]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 44.8 m = 147.0 ft
Main Spans: 1 at 39.9 m = 130.9 ft
Approach Spans: 0
Skew: 48
Width, Roadway: 25.6 m = 84.0 ft (4 Lanes) and Out-To-Out: 27.3 m = 89.6 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [60545]: Cumberland County [005], Maine [23]
Owned by State Highway Agency [01], DOT District: 1
0.1 MI N BACK X'INGUKEYS
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 45.7 metric ton = 50.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 35.3 metric ton = 38.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 30260 (2016) and Trucks: 10%
Future ADT: 42364 (In 2036 )
US1 & I295 over SHERWOOD STREET (Route: 295)
Num:5617x
Open: no restriction [A]
Built: 1954, Reconstructed: 1986
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 13.4 m = 44.0 ft
Main Spans: 1 at 12.8 m = 42.0 ft
Approach Spans: 0
Skew: 1
Width, Roadway: 30.5 m = 100.1 ft (6 Lanes) and Out-To-Out: 32.2 m = 105.6 ft for a 15.2 m = 49.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [60545]: Cumberland County [005], Maine [23]
Owned by State Highway Agency [01], DOT District: 1
.1 MI N 26
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 45.4 metric ton = 49.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 35 metric ton = 38.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 30260 (2016) and Trucks: 10%
Future ADT: 42364 (In 2036 )
US1 & I-295 over CNRR (Route: 295)
Num:5616x
Open: no restriction [A]
Built: 1954, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 48.8 m = 160.1 ft
Main Spans: 3 at 17.7 m = 58.1 ft
Approach Spans: 0
Skew: 33
Width, Roadway: 30 m = 98.4 ft (4 Lanes) and Out-To-Out: 32.2 m = 105.6 ft for a 15.2 m = 49.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [60545]: Cumberland County [005], Maine [23]
Owned by State Highway Agency [01], DOT District: 1
.2 MI N 26
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 45.7 metric ton = 50.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 35.3 metric ton = 38.8 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 33260 (2016) and Trucks: 10%
Future ADT: 46564 (In 2036 )
US1 (BAXTER BLVD) over WASHINGTON AVE NB & SB (Route: 0)
Num:817x
Open: no restriction [A]
Built: 1987, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Segmental box girder [21]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 86 m = 282.2 ft
Main Spans: 2 at 45.4 m = 149.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.5 m = 27.9 ft (1 Lanes) and Out-To-Out: 9.4 m = 30.8 ft for a 8.5 m = 27.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [60545]: Cumberland County [005], Maine [23]
Owned by State Highway Agency [01], DOT District: 1
0.1 MI NE NB&SB CONVERGE
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 96.9 metric ton = 106.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 65.1 metric ton = 71.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 1830 (2016) and Trucks: 10%
Future ADT: 2745 (In 2036 )
US 1 & I295 over KENSINGTON STREET (Route: 295)
Num:5618x
Open: no restriction [A]
Built: 1954, Reconstructed: 1987
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Concrete [1] Tee beam [04]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 16.2 m = 53.2 ft
Main Spans: 1 at 15.2 m = 49.9 ft
Approach Spans: 0
Skew: 33
Width, Roadway: 30.5 m = 100.1 ft (4 Lanes) and Out-To-Out: 32.2 m = 105.6 ft for a 15.2 m = 49.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [60545]: Cumberland County [005], Maine [23]
Owned by State Highway Agency [01], DOT District: 1
.2MI N 26
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 45.4 metric ton = 49.9 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 35 metric ton = 38.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Superior to present desirable criteria [9]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.6 km = 0.4 mi
Traffic
ADT: 33260 (2016) and Trucks: 10%
Future ADT: 46564 (In 2036 )
WASHINGTON AVE SB over I295NB&SB&ECOMMERCIAL ST (Route: 26)
Num:820x
Open: no restriction [A]
Built: 1990, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete continuous [6] Segmental box girder [21]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 123.4 m = 404.9 ft
Main Spans: 3 at 45.7 m = 149.9 ft
Approach Spans: 0
Skew: 11
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 14.6 m = 47.9 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [60545]: Cumberland County [005], Maine [23]
Owned by State Highway Agency [01], DOT District: 1
0.1 MI S OF JCT I295 SB
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 45.7 metric ton = 50.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 35 metric ton = 38.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 7110 (2016) and Trucks: 10%
Future ADT: 9954 (In 2036 )
VERANDA STREET over C N R R (Route: 0)
Num:5052x
Open: no restriction [A]
Built: 2009, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Precast Panels [2] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 10.4 m = 34.1 ft
Main Spans: 1 at 9.1 m = 29.9 ft
Approach Spans: 0
Skew: 31
Width, Roadway: 11.8 m = 38.7 ft (2 Lanes) and Out-To-Out: 15.9 m = 52.2 ft for a 11.8 m = 38.7 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Portland [60545]: Cumberland County [005], Maine [23]
Owned by State Highway Agency [01], DOT District: 1
.3 MI N WASHINGTON ST
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 44.1 metric ton = 48.5 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 34 metric ton = 37.4 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: December 1999 [1299] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 3960 (2016) and Trucks: 5%
Future ADT: 5544 (In 2036 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.