Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 46 m = 150.9 ft
Main Spans: 2 at 22.2 m = 72.8 ft
Approach Spans: 0
Skew: 7
Width, Roadway: 9.8 m = 32.2 ft (2 Lanes) and Out-To-Out: 13.6 m = 44.6 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Sheboygan Falls [73025]: Sheboygan County [117], Wisconsin [55]
Owned by City or Municipal Highway Agency [04], DOT District: 3
0.1M E JCT STH 32
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 55.5 metric ton = 61.1 tons (Load Factor(LF) [1])
Inventory: 34 metric ton = 37.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 2020 [0720] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0.9 km = 0.6 mi
Traffic
ADT: 14872 (2018) and Trucks: 0%
Future ADT: 16359 (In 2039
)