Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 46.9 m = 153.9 ft
Main Spans: 3 at 25 m = 82.0 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 8.7 m = 28.5 ft (2 Lanes) and Out-To-Out: 9.6 m = 31.5 ft for a 8.8 m = 28.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Sebewaing [72180]: Huron County [063], Michigan [26]
Owned by City or Municipal Highway Agency [04], DOT District: 4
0.4 MI E OF M-25
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: Greater than HL93 [B]
Operating: 53.8 metric ton = 59.2 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 41.5 metric ton = 45.7 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: N/A [N]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 5590 (2011) and Trucks: 5%
Future ADT: 880 (In 2031
)