Bridge Type
Main Span(s): Concrete [1] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 14.3 m = 46.9 ft
Main Spans: 1 at 12.8 m = 42.0 ft
Approach Spans: 0
Skew: 42
Width, Roadway: 9.9 m = 32.5 ft (2 Lanes) and Out-To-Out: 12.2 m = 40.0 ft for a 12.8 m = 42.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Freeport [26525]: Cumberland County [005], Maine [23]
Owned by State Highway Agency [01], DOT District: 1
0.9 MI N OF JCT DESERT RD
Condition
Deck: Poor [4]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 42.1 metric ton = 46.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 32.4 metric ton = 35.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: N/A [N] and Bridge not over waterway. [N]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 12879 (2016) and Trucks: 5%
Future ADT: 18031 (In 2036
)