HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 2


JASPER-LOWELL RD over DEXTER LAKE (Route: 0)
Num:39C631622001152x
Open: no restriction [A]
Built: 1980, Reconstructed: N/A [0000]
Historic: Historical significance is not determinable at this time. [4]

Google Streetview (If Available)

Rough Distance: 0 Miles (0 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Box beam or girders - Multiple [05]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 128.3 m = 421.0 ft
Main Spans: 4 at 32 m = 105.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.4 m = 30.8 ft (2 Lanes) and Out-To-Out: 10.3 m = 33.8 ft for a 10.1 m = 33.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Lane County [039], Oregon [41]
Owned by County Highway Agency [02], DOT District: 5
001 MI SO JCT HWY58/6220
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Fair [5]
Loading
Design: MS 18 / HS 20 [5]
Operating: 35.4 metric ton = 38.9 tons (Allowable Stress(AS) [2])
Inventory: 20.9 metric ton = 23.0 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 3.5 km = 2.2 mi
Traffic
ADT: 2982 (2020) and Trucks: 10%
Future ADT: 3092 (In 2025 )
JASPER-LOWELL RD over DEXTER LAKE RESERVOIR (Route: 0)
Num:14725A622001132x
Open: no restriction [A]
Built: 1978, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Slab [01]
Approach Span(s): Other [00]
Deck: Other [9] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 66.1 m = 216.9 ft
Main Spans: 4 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 9.4 m = 30.8 ft (2 Lanes) and Out-To-Out: 10.3 m = 33.8 ft for a 9.8 m = 32.2 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Lane County [039], Oregon [41]
Owned by County Highway Agency [02], DOT District: 5
002 MI SOUTH JCTHWY58/622
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 56.2 metric ton = 61.8 tons (Load Factor(LF) [1])
Inventory: 27.2 metric ton = 29.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and "Bridge with ""unknown"" foundation that has not been evaluated for scour. [U]"
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 3.5 km = 2.2 mi
Traffic
ADT: 2982 (2020) and Trucks: 10%
Future ADT: 3092 (In 2025 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider

About - Contact

Divider