Bridge Type
Main Span(s): Steel [3] Movable - Bascule [16]
Approach Span(s): Concrete continuous [2] Mixed types [20]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Epoxy Overlay [5]
Bridge Dimensions
Length: 502.7 m = 1649.4 ft
Main Spans: 1 at 46.9 m = 153.9 ft
Approach Spans: 22
Skew: 0
Width, Roadway: 8.2 m = 26.9 ft (2 Lanes) and Out-To-Out: 11.1 m = 36.4 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 5.08 m = 16.7 ft and Navigational Clearance: 5.2 m = 17.1 ft
Location
Florence [26050]: Lane County [039], Oregon [41]
Owned by State Highway Agency [01], DOT District: 5
00.7 MI S HWY 062 JCT
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Poor [4]
Loading
Design: M 13.5 / H 15 [2]
Operating: 23 metric ton = 25.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 17.8 metric ton = 19.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 19.9 km = 12.3 mi
Traffic
ADT: 10300 (2018) and Trucks: 18%
Future ADT: 10400 (In 2038
)