MSAS 119 over S BR ZUMBRO RIVER (Route: 119)
Num:55557x
Open: no restriction [A]
Built: 1994, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 49.2 m = 161.4 ft
Main Spans: 3 at 16.5 m = 54.1 ft
Approach Spans: 0
Skew: 17
Width, Roadway: 18.3 m = 60.0 ft (4 Lanes) and Out-To-Out: 23.9 m = 78.4 ft for a 18.3 m = 60.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Rochester [54880]: Olmsted County [109], Minnesota [27]
Owned by City or Municipal Highway Agency [04], DOT District: 6
0.1 MI E OF JCT BROADWAY
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 61.4 metric ton = 67.5 tons (Load Factor(LF) [1])
Inventory: 32.3 metric ton = 35.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 12600 (2016) and Trucks: 0%
Future ADT: 12600 (In 2039 )
MSAS 109 over S BR ZUMBRO RIVER (Route: 109)
Num:55553x
Open: no restriction [A]
Built: 1992, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.1 Miles (0.2 Kilometers)

Bridge Type
Main Span(s): Concrete continuous [2] Slab [01]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 83.2 m = 273.0 ft
Main Spans: 5 at 17.7 m = 58.1 ft
Approach Spans: 0
Skew: 43
Width, Roadway: 19.5 m = 64.0 ft (5 Lanes) and Out-To-Out: 25.7 m = 84.3 ft for a 17.1 m = 56.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Rochester [54880]: Olmsted County [109], Minnesota [27]
Owned by City or Municipal Highway Agency [04], DOT District: 6
0.2 MI N OF JCT 4TH ST S
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 70.6 metric ton = 77.7 tons (Load Factor(LF) [1])
Inventory: 42.1 metric ton = 46.3 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: June 2020 [0620] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 15600 (2014) and Trucks: 0%
Future ADT: 15600 (In 2039 )
MSAS 201 over S FK ZUMBRO RIVER (Route: 201)
Num:55030x
Open: no restriction [A]
Built: 1987, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 54.2 m = 177.8 ft
Main Spans: 3 at 17.6 m = 57.7 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 18.9 m = 62.0 ft (4 Lanes) and Out-To-Out: 25.4 m = 83.3 ft for a 20.4 m = 66.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Rochester [54880]: Olmsted County [109], Minnesota [27]
Owned by City or Municipal Highway Agency [04], DOT District: 6
0.5 MI N OF JCT TH 14
Condition
Deck: Satisfactory [6]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 36.9 metric ton = 40.6 tons (Load Factor(LF) [1])
Inventory: 22.2 metric ton = 24.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 26000 (2016) and Trucks: 3%
Future ADT: 26000 (In 2039 )
MSAS 105 over ZUMBRO RIVER (Route: 105)
Num:55517x
Open: no restriction [A]
Built: 1968, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.5 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 68.6 m = 225.1 ft
Main Spans: 3 at 25.1 m = 82.4 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 13.4 m = 44.0 ft (3 Lanes) and Out-To-Out: 18.9 m = 62.0 ft for a 15.2 m = 49.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Rochester [54880]: Olmsted County [109], Minnesota [27]
Owned by City or Municipal Highway Agency [04], DOT District: 6
0.3 MI E OF JCT TH 63
Condition
Deck: Fair [5]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: MS 18 / HS 20 [5]
Operating: 43.1 metric ton = 47.4 tons (Load Factor(LF) [1])
Inventory: 25.8 metric ton = 28.4 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Countermeasures have been installed to mitigate an existing problem with scour. [7]
Inspections
Date: October 2020 [1020] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8900 (2016) and Trucks: 0%
Future ADT: 8900 (In 2039 )
MSAS 119 over BEAR CREEK (Route: 119)
Num:55588x
Open: no restriction [A]
Built: 2009, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.3 Miles (0.6 Kilometers)

Bridge Type
Main Span(s): Prestressed concrete [5] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Low slump Concrete [4]
Bridge Dimensions
Length: 55.1 m = 180.8 ft
Main Spans: 3 at 18.3 m = 60.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 19.8 m = 65.0 ft (4 Lanes) and Out-To-Out: 30.4 m = 99.7 ft for a 19.8 m = 65.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Rochester [54880]: Olmsted County [109], Minnesota [27]
Owned by City or Municipal Highway Agency [04], DOT District: 6
0.4 MI E OF JCT TH63
Condition
Deck: Satisfactory [6]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: HL93 [A]
Operating: 69.8 metric ton = 76.8 tons (Load Factor(LF) [1])
Inventory: 41.8 metric ton = 46.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Better than present minimum criteria [7]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 12600 (2016) and Trucks: 0%
Future ADT: 12600 (In 2039 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.