Bridge Type
Main Span(s): Steel [3] Girder and floorbeam system [03]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 30.8 m = 101.1 ft
Main Spans: 1 at 28.9 m = 94.8 ft
Approach Spans: 0
Skew: 30
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 8.4 m = 27.6 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Deferiet [19994]: Jefferson County [045], New York [36]
Owned by State Highway Agency [01], DOT District: 73
1 MI E JCT SH 3 & SH 3A
Condition
Deck: Satisfactory [6]
Superstructure: Poor [4]
Substructure: Fair [5]
Loading
Design: M 18 / H 20 [4]
Operating: 39.9 metric ton = 43.9 tons (Load Factor(LF) [1])
Inventory: 23.6 metric ton = 26.0 tons (Load Factor(LF) [1])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Meets minimum tolerable limits to be left in place as is [4]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 2435 (2017) and Trucks: 7%
Future ADT: 3012 (In 2039
)