Bridge Type
Main Span(s): Concrete [1] Arch - Deck [11]
Approach Span(s): Other [00]
Deck: Not applicable [N] with Wearing Surface: Not applicable (applies only to structures with no deck) [N]
Bridge Dimensions
Length: 21 m = 68.9 ft
Main Spans: 1 at 21 m = 68.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.6 m = 24.9 ft (2 Lanes) and Out-To-Out: 9.8 m = 32.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Woodstock [87060]: Grafton County [009], New Hampshire [33]
Owned by State Highway Agency [01], DOT District: 1
5.6 MI FROM THORNTON TL
Condition
Deck: Fair [5]
Superstructure: Fair [5]
Substructure: Fair [5]
Loading
Design: M 13.5 / H 15 [2]
Operating: 43.7 metric ton = 48.1 tons ()
Inventory: 26.3 metric ton = 28.9 tons ()
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: May 2020 [0520] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 2483 (2019) and Trucks: 4%
Future ADT: 3674 (In 2041
)