Bridge Type
Main Span(s): Wood or timber [7] Other [00]
Approach Span(s): Other [00]
Deck: Wood or Timber [8] with Wearing Surface: Wood or Timber [7]
Bridge Dimensions
Length: 97.8 m = 320.9 ft
Main Spans: 1 at 96.6 m = 316.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 3.7 m = 12.1 ft (1 Lanes) and Out-To-Out: 7 m = 23.0 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Brookfield [09325]: Orange County [017], Vermont [50]
Owned by State Highway Agency [01], DOT District: 4
2.3 MI W JCT. VT.14
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: M 9 / H 10 [1]
Operating: 32.4 metric ton = 35.6 tons (Load and Resistance Factor(LRFR) [3])
Inventory: 24.3 metric ton = 26.7 tons (Load and Resistance Factor(LRFR) [3])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: July 1999 [799] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 2.1 km = 1.3 mi
Traffic
ADT: 150 (2018) and Trucks: 1%
Future ADT: 158 (In 2028
)