Bridge Type
Main Span(s): Prestressed concrete continuous [6] Box beam or girders - Multiple [05]
Approach Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 150.7 m = 494.4 ft
Main Spans: 1 at 23.4 m = 76.8 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 15 m = 49.2 ft (4 Lanes) and Out-To-Out: 16.8 m = 55.1 ft for a 14.9 m = 48.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Two Rivers [81325]: Manitowoc County [071], Wisconsin [55]
Owned by City or Municipal Highway Agency [04], DOT District: 3
0.2M N JCT. STH 147
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 49 metric ton = 53.9 tons (Load Factor(LF) [1])
Inventory: 29.2 metric ton = 32.1 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present minimum criteria [6]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 1.6 km = 1.0 mi
Traffic
ADT: 16960 (2018) and Trucks: 11%
Future ADT: 18656 (In 2039
)