Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Other [9]
Bridge Dimensions
Length: 87.3 m = 286.4 ft
Main Spans: 1 at 68.4 m = 224.4 ft
Approach Spans: 2
Skew: 0
Width, Roadway: 7.9 m = 25.9 ft (2 Lanes) and Out-To-Out: 8.5 m = 27.9 ft for a 7.9 m = 25.9 ft approaching roadway.
Vertical Clearance: 5.18 m = 17.0 ft and Navigational Clearance: 0 = N/A
Location
Unknown [00000]: Lane County [039], Oregon [41]
Owned by U.S. Forest Service [64], DOT District: 0
.1 S JCY HWY 126-FS19
Condition
Deck: Satisfactory [6]
Superstructure: Fair [5]
Substructure: Satisfactory [6]
Loading
Design: MS 13.5 / HS 15 [3]
Operating: 40.4 metric ton = 44.4 tons (Load Factor(LF) [1])
Inventory: 24.2 metric ton = 26.6 tons (Load Factor(LF) [1])
Appraisal
Structural: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present minimum criteria [6]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: August 2020 [0820] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 15.8 km = 9.8 mi
Traffic
ADT: 200 (2010) and Trucks: 10%
Future ADT: 300 (In 2041
)