Bridge Type
Main Span(s): Prestressed concrete continuous [6] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 80.5 m = 264.1 ft
Main Spans: 2 at 39.6 m = 129.9 ft
Approach Spans: 0
Skew: 34
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 13.9 m = 45.6 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
New London [56925]: Outagamie County [087], Wisconsin [55]
Owned by State Highway Agency [01], DOT District: 3
5.2M W JCT CTH M
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 18 / HS 20 [5]
Operating: 60.4 metric ton = 66.4 tons (Load Factor(LF) [1])
Inventory: 35.6 metric ton = 39.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: April 1999 [499] and Frequency: 48
Future Work
Work Needed:
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 3900 (2019) and Trucks: 0%
Future ADT: 10250 (In 2038
)