Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 41.1 m = 134.8 ft
Main Spans: 1 at 40.2 m = 131.9 ft
Approach Spans: 0
Skew: 3
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 13.9 m = 45.6 ft for a 13.4 m = 44.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Jay [38396]: Essex County [031], New York [36]
Owned by State Highway Agency [01], DOT District: 12
IN AU SABLE FORKS
Condition
Deck: Excellent [9]
Superstructure: Excellent [9]
Substructure: Excellent [9]
Loading
Design: Other [C]
Operating: 80.7 metric ton = 88.8 tons (Load Factor(LF) [1])
Inventory: 48.1 metric ton = 52.9 tons (Load Factor(LF) [1])
Appraisal
Structural: Superior to present desirable criteria [9]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Somewhat better than minimum adequacy to tolerate being left in place as is [5] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 1999 [999] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 2.4 km = 1.5 mi
Traffic
ADT: 2973 (2018) and Trucks: 8%
Future ADT: 3001 (In 2039
)