HistoricBridges.org Menu: HistoricBridges.org Menu:



BridgeSeek

Nearby Bridges in NBI 2021: 4


VT 00100 ML over LAMOILLE RIVER (Route: 100)
Num:200029021508072x
Open: no restriction [A]
Built: 2009, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0 Miles (0.1 Kilometers)

Bridge Type
Main Span(s): Steel [3] Truss - Thru [10]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 39 m = 128.0 ft
Main Spans: 1 at 37.8 m = 124.0 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 7.3 m = 24.0 ft (2 Lanes) and Out-To-Out: 8.1 m = 26.6 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Morrisville [46825]: Lamoille County [015], Vermont [50]
Owned by Town or Township Highway Agency [03], DOT District: 8
1.0 MI S JCT. VT.15
Condition
Deck: Very Good [8]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 57.6 metric ton = 63.4 tons (Allowable Stress(AS) [2])
Inventory: 37.8 metric ton = 41.6 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Basically intolerable requiring high priority of replacement [2]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Better than present minimum criteria [7] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed: Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Bridge Detour: 0.5 km = 0.3 mi
Traffic
ADT: 7900 (2018) and Trucks: 9%
Future ADT: 8295 (In 2028 )
C30BS over LAMOILLE RIVER (Route: 0)
Num:100807005308071x
Open: no restriction [A]
Built: 2006, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.2 Miles (0.3 Kilometers)

Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Monolithic Concrete (concurrently placed with structural deck) [1]
Bridge Dimensions
Length: 31.4 m = 103.0 ft
Main Spans: 1 at 30.2 m = 99.1 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 4.5 m = 14.8 ft (1 Lanes) and Out-To-Out: 5.3 m = 17.4 ft for a 4.9 m = 16.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Morrisville [46825]: Lamoille County [015], Vermont [50]
Owned by City or Municipal Highway Agency [04], DOT District: 8
0.1 MI TO JCT W MAIN ST.
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 79.2 metric ton = 87.1 tons (Load Factor(LF) [1])
Inventory: 47.7 metric ton = 52.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Equal to present minimum criteria [6]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 15.9 km = 9.9 mi
Traffic
ADT: 10 (2019) and Trucks: 1%
Future ADT: 11 (In 2029 )
ALT VT 00100 ML over LAMOILLE RIVER (Route: 100)
Num:200029215A08072x
Open: no restriction [A]
Built: 2014, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.4 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Frame [07]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 166.1 m = 545.0 ft
Main Spans: 3 at 78 m = 255.9 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 12 m = 39.4 ft (2 Lanes) and Out-To-Out: 12.9 m = 42.3 ft for a 13.7 m = 44.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Morristown [46675]: Lamoille County [015], Vermont [50]
Owned by State Highway Agency [01], DOT District: 8
1.3 MI S JCT. VT. 15
Condition
Deck: Good [7]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 80.1 metric ton = 88.1 tons (Load Factor(LF) [1])
Inventory: 46.8 metric ton = 51.5 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: August 1999 [899] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.2 km = 0.1 mi
Traffic
ADT: 8800 (2018) and Trucks: 9%
Future ADT: 9240 (In 2028 )
TR 03 FAS 238 over LAKE LAMOILLE (Route: 3)
Num:200238000908072x
Open: no restriction [A]
Built: 1984, Reconstructed: N/A [0000]
Historic: Bridge is not eligible for the NRHP. [5]

Google Streetview (If Available)

Rough Distance: 0.5 Miles (0.7 Kilometers)

Bridge Type
Main Span(s): Steel continuous [4] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 83.5 m = 274.0 ft
Main Spans: 2 at 41.1 m = 134.8 ft
Approach Spans: 0
Skew: 0
Width, Roadway: 8.8 m = 28.9 ft (2 Lanes) and Out-To-Out: 10 m = 32.8 ft for a 9.1 m = 29.9 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Morristown [46675]: Lamoille County [015], Vermont [50]
Owned by Town or Township Highway Agency [03], DOT District: 8
0.3 MI W JCT. VT.100
Condition
Deck: Good [7]
Superstructure: Good [7]
Substructure: Good [7]
Loading
Design: MS 18+Mod / HS 20+Mod [6]
Operating: 74.7 metric ton = 82.2 tons (Allowable Stress(AS) [2])
Inventory: 41.4 metric ton = 45.5 tons (Allowable Stress(AS) [2])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: September 2020 [0920] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.3 km = 0.2 mi
Traffic
ADT: 860 (2017) and Trucks: 6%
Future ADT: 903 (In 2027 )

Special Bridge Conditions Legend: R - Former location of relocated bridge. ! - At risk for demolition or destruction. X - Confirmed demolished or collapsed. S  - Dismantled and/or in storage. L -  Severe loss of historic integrity due to alteration.

Divider

Back

Top

Divider