Bridge Type
Main Span(s): Concrete continuous [2] Arch - Deck [11]
Approach Span(s): Concrete continuous [2] Tee beam [04]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Latex Concrete or similar additive [3]
Bridge Dimensions
Length: 503.7 m = 1652.6 ft
Main Spans: 5 at 81.9 m = 268.7 ft
Approach Spans: 10
Skew: 0
Width, Roadway: 8.2 m = 26.9 ft (2 Lanes) and Out-To-Out: 11.1 m = 36.4 ft for a 8.2 m = 26.9 ft approaching roadway.
Vertical Clearance: 30.48 m = 100.0 ft and Navigational Clearance: 39.6 m = 129.9 ft
Location
Newport [52450]: Lincoln County [041], Oregon [41]
Owned by State Highway Agency [01], DOT District: 4
NEWPORT S C LIMITS
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Satisfactory [6]
Loading
Design: M 13.5 / H 15 [2]
Operating: 23 metric ton = 25.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 17.8 metric ton = 19.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Basically intolerable requiring high priority of corrrective action [3]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Superior to present desirable criteria [9] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: June 1999 [699] and Frequency: 24
Future Work
Work Needed: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Bridge Detour: 13.1 km = 8.1 mi
Traffic
ADT: 16500 (2018) and Trucks: 4%
Future ADT: 16600 (In 2038
)