Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Bituminous [6]
Bridge Dimensions
Length: 22.9 m = 75.1 ft
Main Spans: 1 at 21.9 m = 71.9 ft
Approach Spans: 0
Skew: 45
Width, Roadway: 7.1 m = 23.3 ft (2 Lanes) and Out-To-Out: 8.3 m = 27.2 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Cambridge [11425]: Lamoille County [015], Vermont [50]
Owned by Town or Township Highway Agency [03], DOT District: 8
0.15 MI TO JCT W VT15
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Very Good [8]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 89.1 metric ton = 98.0 tons (Load Factor(LF) [1])
Inventory: 75.6 metric ton = 83.2 tons (Load Factor(LF) [1])
Appraisal
Structural: Equal to present desirable criteria [8]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Inspections
Date: July 2020 [0720] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0.8 km = 0.5 mi
Traffic
ADT: 820 (2019) and Trucks: 3%
Future ADT: 861 (In 2029
)