Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 49.7 m = 163.1 ft
Main Spans: 1 at 49 m = 160.8 ft
Approach Spans: 0
Skew: 7
Width, Roadway: 11 m = 36.1 ft (2 Lanes) and Out-To-Out: 15 m = 49.2 ft for a 11 m = 36.1 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Plattsburgh [58574]: Clinton County [019], New York [36]
Owned by City or Municipal Highway Agency [04], DOT District: 71
BROAD ST OVER SARANAC RIV
Condition
Deck: Very Good [8]
Superstructure: Very Good [8]
Substructure: Good [7]
Loading
Design: MS 22.5 / HS 25 or greater [9]
Operating: 89.8 metric ton = 98.8 tons (Load Factor(LF) [1])
Inventory: 54.4 metric ton = 59.8 tons (Load Factor(LF) [1])
Appraisal
Structural: Better than present minimum criteria [7]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present minimum criteria [6] and Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Inspections
Date: May 1999 [599] and Frequency: 24
Future Work
Work Needed: Widening of existing bridge with deck rehabilitation or replacement. [34]
Bridge Detour: 0.1 km = 0.1 mi
Traffic
ADT: 6477 (2018) and Trucks: 5%
Future ADT: 6507 (In 2039
)