Bridge Type
Main Span(s): Steel [3] Stringer/Multi-beam or girder [02]
Approach Span(s): Other [00]
Deck: Concrete Cast-in-Place [1] with Wearing Surface: Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]
Bridge Dimensions
Length: 23.4 m = 76.8 ft
Main Spans: 1 at 22.6 m = 74.2 ft
Approach Spans: 0
Skew: 35
Width, Roadway: 6.7 m = 22.0 ft (2 Lanes) and Out-To-Out: 7.6 m = 24.9 ft for a 7.3 m = 24.0 ft approaching roadway.
Vertical Clearance: 99.99 m = 328.1 ft and Navigational Clearance: 0 = N/A
Location
Whitneyville [85290]: Washington County [029], Maine [23]
Owned by State Highway Agency [01], DOT District: 4
3.6 MILES W'LY JCT 192
Condition
Deck: Satisfactory [6]
Superstructure: Satisfactory [6]
Substructure: Poor [4]
Loading
Design: M 13.5 / H 15 [2]
Operating: 22.4 metric ton = 24.6 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Inventory: 17.5 metric ton = 19.3 tons (Load and Resistance Factor Rating (LRFR) rating reported by rating factor (RF) method using HL-93 loadings [8])
Appraisal
Structural: Meets minimum tolerable limits to be left in place as is [4]
Deck Geometry: Meets minimum tolerable limits to be left in place as is [4]
Road Alignment: Equal to present desirable criteria [8]
Waterway: Equal to present desirable criteria [8] and Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inspections
Date: December 2020 [1220] and Frequency: 24
Future Work
Work Needed:
Bridge Detour: 0 km = 0.0 mi
Traffic
ADT: 800 (2016) and Trucks: 5%
Future ADT: 1280 (In 2036
)